If so, the pilot test is for you. AMCON will prepare an actual machine at your wastewater treatment plant and deliver a dewatering test on the actual sludge that you want to treat. This is a great opportunity to see first-hand the performance of the sludge dewatering press, as well as its operation and maintenance methods. We have received favourable comments from our customers who are considering the introduction of a sludge dewatering press as they can eliminate their concerns before its introduction.
Pilot Test
You might be thinking...
“We want to see how VOLUTE™ dewaters our sludge, in real operation under real conditions.”
“We’re planning to replace our existing dewatering machine and would like to try other sludge dewatering machines.”
“We are planning to install a sludge dewatering press for the first time and are worried about its operation and maintenance.”
Pilot Test Examples
Examples of Pilot Test locations
Please consult with us about the location of the pilot test, whether it’s outdoors or indoors.
Example of videos from Pilot Tests
Available Products
We can perform testing using the VOLUTE™ Dewatering Press, VOLUTE DUO™ Dewatering Press, Polymer Make-up System, or other compatible models upon request.
How to request a Pilot Test
1. Inquiry and Consultation
For a consultation or inquiry, please use this form to contact us. We will ask you about the sludge type, amount of sludge, and installation site.
2. Free Sludge Sample Analysis
It’s ideal if we can analyze the sludge before the pilot test to ensure it runs smoothly. Please send us 2 to 5 liters of sludge, ensuring the canisters are well-sealed and labeled.
Address for sludge sample
AMCON Europe s.r.o. – Laboratory
Za Trati 207, 252 19 Chrastany, Praha-zapad, Czech Republic
TEL : +420 211 150 120
3. Site Inspection
We will visit the site if necessary or consult over the phone to ensure everything is prepared for the pilot test, including space, suitable connections, and preparation for sludge cake and filtrate disposal.
4. Transport and Pilot Test
After transporting the machine to the installation site and making operational adjustments, you can evaluate its performance. Following the pilot test, you will receive a detailed report to help you make an informed decision.